MANUFACTURING PACK · Q-1184 · REV 14
Issued 28 Aug 2026 · Halvorsen, 14 Ferndale Ave Chatswood NSW 2067
Released for construction
Drawing plan + section A–A · dimensions in mm unless noted
SHALLOW 1200 DEEP 1900 A A 10400 4000 1500 DECK BULLNOSE COPING 30.5 lm N PLAN · 1:75
FGL 0.00 WL 1200 1900 SHELL WALL t = 150 GRP LAMINATE, VINYL ESTER 50 SAND BASE, COMPACTED SLOPE 1:7.5 EXCAVATION 129 m³ CLASS M · OFF SITE WATER VOLUME 55.5 m³ · SURFACE 35.8 m² · PERIMETER 30.5 lm SECTION A–A · 1:75
Cut list / bill of materials 7 lines · Q-1184 rev 14
Part code Description Qty Unit
TP-SHL-K1040 Fibreglass shell, kidney 10400 × 4000 GRP vinyl ester, t=150, depth 1200–1900, colour Deep Blue 1off
TP-DEK-MER Merbau decking board, 140 × 19 57.3 m² coverage · 412 lm · secret-fixed from below, 5 % waste incl. 412lm
TP-COP-BN Bullnose coping, precast, 400 × 50 Follows shell perimeter · 8 radius units, 62 straight units 30.5lm
TP-BAR-GL12 Frameless glass panel, 12 mm toughened, 1200 high 39.2 lm total · 26 panels + 1 self-closing gate · AS 1926.1 27off
TP-PLT-PMP Plant set: VS pump 1.5 hp, cartridge filter, salt cell Turnover 55.5 m³ in 5.5 h · SE corner enclosure 1set
TP-PIP-PVC50 Pipework, 50 mm PVC pressure, solvent weld 2 suction + 2 return runs · incl. 14 elbows, 4 unions 68lm
TP-BSE-SND Sand base bedding, compacted to 50 mm Screeded to shell profile, laser-levelled ±3 mm 2.4
All quantities generated from the solid model. Any site variation raises a REV and re-issues this pack. Do not work from a superseded print.
Set-out & tolerances
Datum Shell shallow-end centreline, 1200 off north boundary. Set out from boundary pegs, not from the dwelling.
Level Coping to fall 0 mm across the run. Laser-check all four quadrants before the shell is grouted in.
Shell ±10 mm on plan position. ±3 mm on level. Out of tolerance: stop and call the office. Do not pack the coping to correct it.
Deck Board runs parallel to the long axis. 4 mm gap, 1:100 fall away from the coping for drainage.
Barrier Panel spigots set before the deck boards land, so no board is cut around a fixing after the fact.
Sequence 22 working days
01Excavation 3 d
02Base prep 2 d
03Shell set 1 d
04Plumbing 2 d
05Backfill 3 d
06Deck 6 d
07Barrier 3 d
08Commission 2 d
Critical path in terracotta. Shell set is a single-day crane-free lift: the slot must not slip or the deck crew stands down.
Site notes
Access 2800 wide via side gate, north boundary. Excavator max width 2600.
Crane Not required. Shell walked in on rollers through side access.
Spoil 129 m³ removed off site. No stockpiling on nature strip; council permit not held.
Soil Class M per report GS-4471. Moderately reactive. Standard bedding applies.
Services DBYD lodged. Sewer 1.8 m off south boundary. Hand-dig within 1 m.
Barrier must be certified before water is added. No handover without the AS 1926.1 compliance certificate on file.
NOTES
1. Do not scale from this drawing. Figured dimensions govern.
2. All dimensions in millimetres unless noted otherwise.
3. Shell wall thickness 150 nominal, GRP vinyl ester laminate.
4. Verify all set-out on site against boundary pegs before excavation.
5. Glass barrier to AS 1926.1: 1200 min height, 100 max gap at base.
6. Quantities derived from the model: water 35.8 m², volume 55.5 m³, perimeter 30.5 lm, surround 57.3 m², barrier 39.2 lm, excavation 129 m³.
Project
Halvorsen residence, 14 Ferndale Ave, Chatswood NSW 2067
Drawing
Pool shell: plan & section
Quote ref
Q-1184
Drawn by
J. Renwick
Checked by
A. Petrakis
Scale
1:75 @ A2
Date
28.08.26
Rev
14
Status
Released
Sheet
1 of 3
Issued by
True Point
True Point · manufacturing pack Q-1184 rev 14 · sheet 1 of 3 Supersedes rev 13 (26.08.26) Print A2 at 100 %